Vacuum and Epics

From NSS Wiki
Jump to navigation Jump to search

Login

  • To bring up epics, ask Annika or Martin for access to isacepics login.

Navigation

  • From the main menu, go to "vacuum2->HEBT-GP3" to open the ANASEN vacuum page (called HEBT-GP3 Vacuum)
Epics menu
HEPT-GP3 vacuum page
  • To view conditions of upstream beamline, click the "HEBT" button on the left of the page.
HEBT3 Vacuum

Pump down

HEBT valves position.
Manual valve - HEBT:MV19.


No window (fast pump down)

  • For fast pump down, make sure the manual valve is fully open
  • Close HEBT:VV19 (if open)
  • Start HEBT:RP19 and observe pressure on HEBT:CG19B
  • Once HEBT:CG19B is showing a reading below 50mTorr, open HEBT:PB19

With window (slow pump down)

Venting

No window (slow venting procedure)

With window (fast venting procedure)