Xxx

From NSS Wiki
Jump to navigation Jump to search

Present: MA, TA, SK, Greg Hackman, Kris Starosta

  • Close-out meeting for S1758, TIGRESS/TIP OLIS. Starosta PI. 5/29-6/2
  • Foils used at beginning lost some time, but not an issue in the end. Installing new foils during shutdown part of regular maintenance activity
  • Good data, can always take more. Run was good prep for RIB and Ca target
  • "Spectactular" beam spot size.
  • Energy changes were done on the fly (not discussed during beam dev meeting) and also added new beam during run. These went smoothly
  • KS happy with the beam tally (medium priority expiring anyway). Ready for RIB portion of experiment
  • Target formations went well. Oxygen content quite low, few %. Ca underneath layer of gold.