Jump to content

New pages

New pages
Hide registered users | Hide bots | Hide redirects

6 July 2022

  • 12:3212:32, 6 July 2022 Closeoutmeeting S2006 (hist | edit) [1,073 bytes] Lennarz (talk | contribs) (Created page with "S2006 Close-out meeting - July 7th, 2022 ISAC II counting room Present: Spencer Kiy, Alessia di Pietro, Marisa Gulino, Annika Lennarz *Communication excellent! Experimenters were very happy with support from TRIUMF *Marisa estimated number of beam hours of what we got from epics read out: 44 hrs in total at average ~10epA *Sometimes 500epA. Maybe signs of discharge at cup? Can't be real *~3e6 pps of 26Al, assuming the same ratio of 26Mg and 26Al was the same as at the...")
  • 10:2710:27, 6 July 2022 Logbook (hist | edit) [791 bytes] Lennarz (talk | contribs) (Created page with "S2006 *Marisa, Alessia *Communication excellent! *estimate of what we got from epics read out *44 hrs in total ~10epA *Sometimes 500epA *~3e6 pps, assuming the same ratio of 26Mg and 26Al was the same as at the beginning *30% 26Al and 70% 26Mg *in future singly charged 45kV, 1+ and then boost with RF cavity + 8kV *What's the number for the online experiment *next opportunity: May 2023, 23Na stable beam at DRAGON *Discussion on EEC priorities *Q-value separation in event...")

22 June 2022

  • 01:5601:56, 22 June 2022 Xxx (hist | edit) [699 bytes] Malcorta (talk | contribs) (Created page with "Present: MA, TA, SK, Greg Hackman, Kris Starosta *Close-out meeting for S1758, TIGRESS/TIP OLIS. Starosta PI. 5/29-6/2 *Foils used at beginning lost some time, but not an issue in the end. Installing new foils during shutdown part of regular maintenance activity *Good data, can always take more. Run was good prep for RIB and Ca target *"Spectactular" beam spot size. * Energy changes were done on the fly (not discussed during beam dev meeting) and also added new beam du...")

20 June 2022

15 June 2022

14 June 2022

  • 09:3309:33, 14 June 2022 Closeoutmeeting June10th2022 (hist | edit) [1,129 bytes] Lennarz (talk | contribs) (Created page with "Present: MA, TA, SK, FS, AL *Close out meeting after DRAGON HPGe run S1880 *Hours delivered: 93hr. FS agrees with Ops. No major interruptions from beam delivery side *Took data on one energy, 1 data point *Received ~6e12 pps. Next run, we need to push for close to 1e13 pps *Miscommunication on DRAGON side about start on resonance *SK mentions that Keerthi suspects source condition to be the issue. Source hasn't been cleaned before start up *Should remember to schedule n...")

10 June 2022