Closeoutmeeting S2006
		
		
		
		Jump to navigation
		Jump to search
		
S2006 Close-out meeting - July 7th, 2022 ISAC II counting room
Present: Spencer Kiy, Alessia di Pietro, Marisa Gulino, Annika Lennarz
- Communication excellent! Experimenters were very happy with support from TRIUMF
 - Marisa estimated number of beam hours of what we got from epics read out: 44 hrs in total at average ~10epA
 - Sometimes 500epA. Maybe signs of discharge at cup? Can't be real
 - ~3e6 pps of 26Al, assuming the same ratio of 26Mg and 26Al was the same as at the beginning
 - 30% 26Al and 70% 26Mg
 - in future singly charged 45kV, 1+ and then boost with RF cavity + 8kV
 - What's the number for the online experiment
 - next opportunity: May 2023, 23Na stable beam at DRAGON
 - Discussion on EEC priorities
 - Q-value separation in event reconstruction, second channel may not be able to be cleaned up.
 - post stripper needed for 12C reduction
 - Send survey!
 - Target ladder to be stored
 - Boxes left here, labeled with detectors, one wheel is broken, 2 boxes are empty
 - One box has cables
 - All expensive stuff is in one box
 - Just prea-mplifiers for Neven need to be send back