Xxx
Jump to navigation
Jump to search
Present: MA, TA, SK, Greg Hackman, Kris Starosta
- Close-out meeting for S1758, TIGRESS/TIP OLIS. Starosta PI. 5/29-6/2
- Foils used at beginning lost some time, but not an issue in the end. Installing new foils during shutdown part of regular maintenance activity
- Good data, can always take more. Run was good prep for RIB and Ca target
- "Spectactular" beam spot size.
- Energy changes were done on the fly (not discussed during beam dev meeting) and also added new beam during run. These went smoothly
- KS happy with the beam tally (medium priority expiring anyway). Ready for RIB portion of experiment
- Target formations went well. Oxygen content quite low, few %. Ca underneath layer of gold.