Vacuum and Epics
		
		
		
		Jump to navigation
		Jump to search
		
Login
- To bring up epics, ask Annika or Martin for access to isacepics login.
 
- From the main menu, go to "vacuum2->HEBT-GP3" to open the ANASEN vacuum page (called HEBT-GP3 Vacuum)
 
- To view conditions of upstream beamline, click the "HEBT" button on the left of the page.
 
Pump down
No window (fast pump down)
- For fast pump down, make sure the manual valve is fully open
 - Close HEBT:VV19 (if open)
 - Start HEBT:RP19 and observe pressure on HEBT:CG19B