Vacuum and Epics: Difference between revisions
Appearance
| Line 21: | Line 21: | ||
===No window (fast pump down)=== | ===No window (fast pump down)=== | ||
*For fast pump down, make sure the manual valve is fully open | |||
*Close HEBT:VV19 (if open) | |||
*Start HEBT:RP19 and observe pressure on HEBT:CG19B | |||
===With window (slow pump down)=== | ===With window (slow pump down)=== | ||
Revision as of 18:45, 15 June 2022
Login
- To bring up epics, ask Annika or Martin for access to isacepics login.
Navigation
- From the main menu, go to "vacuum2->HEBT-GP3" to open the ANASEN vacuum page (called HEBT-GP3 Vacuum)


- To view conditions of upstream beamline, click the "HEBT" button on the left of the page.

Pump down


No window (fast pump down)
- For fast pump down, make sure the manual valve is fully open
- Close HEBT:VV19 (if open)
- Start HEBT:RP19 and observe pressure on HEBT:CG19B